| |
Laser laboratory
Precise cutting of metal sheets using computer-controlled equipment replaces the traditional technology of press cutting. |
|
| |
Pre-production tasks
Preliminary chemical treatment
Preliminary chemical treatment of the closed profiles prior to their further handling in the welding shop. |
|
| |
Powder application technology
Powder application technology is used to apply the paint on those parts which are subject to extreme loads and abrasion. |
|
| |
Cataphoresis
The lift transporting the skeleton to the cataphoresis vat |
|
| |
Cataphoresis - box for removing grease from the skeleton |
|
| |
Cataphoresis
Final removal of grease from the skeleton prior to cataphoresis |
|
| |
Cataphoresis
The skeleton is leaving the box where the chemical treatment of the surfaces takes place prior to dipping the skeleton into the cataphoretic bath. |
|
| |
Cataphoresis
Cataphoresis vat - rinsing |
|
| |
Cataphoresis
The phase during which the chemically treated skeleton is submerged in the cataphoresis vat. |
|
| |
Cataphoresis
Placing the spare parts in cataphoresis |
|
| |
Cataphoresis
Shifting the skeleton from cataphoresis to the baking box |
|
| |
Cataphoresis
Transporting the skeleton by lift |
|
| |
Cementation of the side panels
The workshop containing the new technology for cementing the side panels to the bus skeleton. |
|
| |
Boxes for preparatory tasks
Box for surface preparation prior to surface painting proper (grinding, masking, applying putty, etc.). |
|
| |
Painting boxes
Painting robot for application of the primer paint (right); manual paint application (left). |
|
|
| |
Output quality check-up
Here the quality of the applied paint is being checked up (thickness of the applied layer, surface tension, etc.). |
|
| |
Outgoing control
paint control |
|
| |
The skeleton is transported from the paint shop to the assembly line. |
|
| |
A view of the organisation of the assembly line premises. |
|
| |
Installation of electrics |
|
|
| |
Glazing
Glazing of the bus is done by cementing the glass to the vehicle body. |
|
| |
Preparation of the front glass
fitting into the rubber |
|
| |
Assembly of the axles
The place where the axles are mounted on the bus (here the front axle being fitted on an Ares 15M). |
|
| |
Assembly of the engine
The place where the drive unit is assembled - the IVECO CURSOR engine. |
|
| |
Finishing stage
The final phase - mounting the aggregates, regulating the doors, adding the media, assembly of the seats, etc. |
|
| |
This section of the manufacturing process includes the test of waterproof quality of the vehicle body in a special cabin using water sprinklers. |
|
| |
Final quality inspection prior to handing the vehicle over to the shipping department. |
|
| |
In this shop, minor modifications are made and special customised equipment is provided; any other finishing touches are done in this shop, too. |
|
| Note: All the above photos are the property of ojes Company and their use by third parties is subject to relevant regulations of the Copyright Act 121/2000 Coll. |